Monday, March 14, 2011

Layout Progress - March 14, 2011

This past weekend marked a milestone in this layout's building: the completion of all major benchwork. I finally built the helix base, something I've put off until plans were much more finalized.


The base is just 2x4s with the center space being 24"x24", just large enough to pop-up in. The bottom is about 30" off the floor so it'll be a crawl into, but hopefully after construction those instances will be few and far between. I then connected the center peninsula with the wall-mounted benchwork on this side of the layout:


I hadn't posted a picture before of it, but here are two pictures of the new section of benchwork for the psuedo-nolix/loop/straight climb area for transition between decks:


I'm debating on whether or not to paint the frame of the second level white. I've heard that helps to reflect light for the bottom level. I'm just not sure I want to put the effort in if it's only a minimal gain. If anyone has experience, good or bad with this, let me know. After that, it'll be running the bus wires for each level and cutting up the hardboard I bought for the backdrops.

0 comments:

Post a Comment

About

Welcome to the my Conrail Model Railroad site. I will document the research, design, construction and operations of my N-scale model railroad based on Conrail's Ft. Wayne Line in Ohio.

Conrail Ft. Wayne Line © Header image from J. Alex Lang Template Nice Blue modified by Indian Monsters. Original created by http://ourblogtemplates.com.

TOP