Monday, December 16, 2013

Update 12/16/13

I spent the weekend putting up the plywood shelving, five 1 ft. boards in all, under the main layout. After I did that, I thought to myself, those would work for a staging yard. Anyways, after that, I started to cut up into 12" strips all the cardboard I've been saving. It turns out that only getting through half of it yielded an 8' pile 14" thick so I'm going to recycle the rest as most of what I have down there are products we get regularly at the moment, like a lot of bulk items from BJs or Sams Club. Tonight is clean the floor area so I can start moving around tubs and I may go get one of those metal shelving to use as a work bench as the one I've been keeping my eye on is now down below $80.

0 comments:

Post a Comment

About

Welcome to the my Conrail Model Railroad site. I will document the research, design, construction and operations of my N-scale model railroad based on Conrail's Ft. Wayne Line in Ohio.

Conrail Ft. Wayne Line © Header image from J. Alex Lang Template Nice Blue modified by Indian Monsters. Original created by http://ourblogtemplates.com.

TOP